Most outstanding projects

Urban Planning and General Systems

  • Basic Survey for the General Sewage Collectors System of the townships of El Sauzal, Tacoronte, La Laguna, Tegueste, Santa Cruz de Tenerife and El Rosario.
  • Tío Pino District Urban Planning and General Systems.
  • Tío Pino District Urban Planning and General Systems. Phase I.
  • Tío Pino District Urban Planning and General Systems. Phase II.
  • General Mola, Nueva and Cinco streets Urban Planning.
  • Molino de Viento Street Urban Planning. Phase II (original).
  • Molino de Viento Street Urban Planning. Phase II (separated).
  • Molino de Viento Street Urban Planning. Phase III.
  • Urban Planning of Chimiche to San Isidro Road.
  • Modified Project number 4. Molino del Viento Street Urban Planning. Phase II.
  • Modified Project number 1. Tío Pino District Urban Planning and General Systems. Phase II.
  • Modified Project number 2. Tío Pino District Urban Planning and General Systems. Phase II
  • Viñatea Street Urbanization.
  • City Centre Stage 17. Urban Planning.
  • Urbanization of “La Longuera” Partial Plan.
  • San Isidro Urban Integral Plan. Sector 1.1, Robayna.
  • San Isidro Urban Integral Plan. Sector 3.
  • Amendment to 14, “La Longuera” S.A.P.U.R. Urban Partial Plan Project.
  • Collaboration with D. Manuel Fernández del Castillo in the writing of the “Project for Integral Recovery of San Andrés”.
  • S.A.P.U.R. 20 “Los Barrios” Partial Urban Planning.
  • S.A.P.U.R. 14 “La Longuera” Partial Urban Planning.

Roads

  • Modification of the Layout Subsidiary Rules. San Isidro General Transport System.- Industrial Estate. Airport Access to TF1 road between  Los Cristianos and Las Americas Beach.
  • Collaboration with Viatrio-Piñero Consultores in planning the Access Road to La Salamera and Costa de Tiguerorte Settlements.
  • Collaboration with Viatrio-Piñero Consultores in establishing the Preliminary Planning For Variant to Puerto Naos, Las Hoyas d El Remo Access Road.
  • Collaboration with Viatrio-Piñero Consultores in establishing the Preliminary Planning Of the Secondary Connection Road City Centre- La Polvacera.
  • Study necessary for the writing of the Project: “Variant to Puerto Naos, Las Hoyas and El Remo access Road”.
  • Collaboration with Viatrio-Piñero Consultores in the writing for the Connection Road: La Polvacera-City Centre Secondary Road”.
  • La Esperanza Urban Crossing Road TF-226.
  • Los Menceyes Avenue, Phase II.
  • Viability Study for the Access Road to Taguluche from the CV-6.
  • Special Preliminary Territorial Planning and Preliminary Planning to the Transport Infrastructure between Arure and Taguluche.

Others

  • Topographic Survey of Finca de Erques.
  • Packing Bay and Social Building in Erques.
  • Bridge to access Mr Antonio Morales Plasencia´s Estate.
  • Enlargement of Finca de Erques.
  • Action Plan for the introduction of a Recycling Plant in Tenerife.
  • Technical Documentation for the request of the Provisional Use of the Heliport low-Lying area.
  • Study for the Reorientation of the Special Action Plan in La Gomera. Cartography.
  • La Gomera Insular Arrangement Plan (collaboration).
  • Natural Risk Study of the Tahodio Ravine (in collaboration with SOLITEC and IRCITERRA).
  • Collaboration in the writing of “General Urban Planning of Santa Cruz de Tenerife”.
  • Natural Risk Study of Landslide in Santa Cruz de Tenerife.