Most outstanding projects

Hydraulic Infrastructures

  • Water collection and distribution in Los Abrigos.
  • Purification system for La Quinta I Lagos.
  • Avalos submarine sewage outlet.
  • Rubens-Marichal urbanization reservoir.
  • Buenavista Golf desalination plant. Boring wells for sea water collection.
  • Collaboration with Viatrio-Piñero Consultores, S.L. in writing Montaña de Arco Dam Project.
  • Report on the execution of Bediesta Dam Dike.
  • Buenavista Golf desalination plant.
  • Avalos and Rincón Ravines channelling.
  • Pedacitos Ravine conditioning.
  • Sewage Infrastructure Plan for the San Isidro West Ravine.
  • Technical and economical viability study for the Poncio Ravine Cover and Rehabilitation Project.
  • Modified  Project for the Channelling of Avalos and Rincón Ravines.
  • Channelling of Cha-Joaquina Ravine.
  • Restoration and Restitution works for the damages caused by El Cercado Ravine in San Andrés due to the 31st March torrential rains in the township of Santa Cruz de Tenerife.
  • Las Eras submarine sewage outlet.
  • Restoration and Restitution of Casalón Ravine (urban section) and  cleansing of Almeida Ravine Channelling.
  • Channelling of the Tributary Section of Las Gavias or Cera Ravine.
  • Channelling of Almeida and La Leña Ravines drainage systems in Santa Cruz de Tenerife Side Dock.
  • Restoration and Restitution works of damaged infrastructures. City Rain Drainage System. Collector Interceptor 1, Santiago Cuadrado Street.
  • Fatima Irrigation Regulating Reservoir.
  • Preventive Reinforcement for the Punta de Hidalgo Submarine Sewage Outlet.
  • Green Areas Irrigation using Purified Water  in the township of Santa Cruz de Tenerife.
  • Preliminary Plan for Granadilla Harbour.
  • Restoration and Restitution works of damaged infrastructures. City Rain Drainage System. Collector Interceptor 1, Santiago Cuadrado St. Section I: Oliver Road.
  • Complementary Documentation of Buenavista Golf Desalination Plant Project.
  • Summary Report and Environmental Documentation for the Preliminary Plan of Granadilla Harbour.
  • Study on the Current State and Development of the Sewage System in Valle de La Orotava.
  • Preliminary Plan for the West of  Tenerife “E.D.A.M”.
  • Summary Report and Environmental Documentation of the E.D.A.M. of the West of Tenerife.
  • Report on the Execution of Bediesta Dam Dike (August 2003).
  • Encauzamiento del Barranco de Las Huertas en su Desembocadura en el Barranco del Cercado en el Barrio de San Andrés.
  • Channelling of the Las Huertas Ravine where its Mouth meets the Cercado Ravine in San Andrés district.
  • Channelling of the Cercado Ravine in the San Andrés district.
  • Bridge Construction Project over the Cercado Ravine in the San Andrés district.
  • Structural Measurements for the Bridge Construction Project on the Cercado Ravine.
  • Sea Water Collection in the Fishing Basin of Santa Cruz de Tenerife Harbour.