Regenerating and conditioning of San Blas Beach and promenade.
This project for regenerating and conditioning of San Blas Beach and Promenade whose works can be summarized as follows:
- Regenerating the beach with 0.6-0.7 mm sands, coming from submarine deposits, from crushing or imported from Africa
- Design and definition of the side and submarine closing docks
- Coursing Orchilla ravine in order to evacuate the maximum water levels with a return period of 500 years
- Promenade and recreational equipment, parking lots and connection with Los Abrigos through a footbridge
Landscape architecture with gardening with native species, or those recommended on the Practical Guide: “Flora of Tenerife”, edited by Cabildo de Tenerife.